Drying procedure - MTS GmbH

MTS Drying procedure

Strand

Sustainably dry walls in a short time

MTS Wall drying. Simple and reliable.

Drying procedure

 

The drying-out time is analogous to the time the water requires to rise in the capillaries.

The drying procedure varies according to the character of the building and the masonry.

Concrete dries faster than sandstone.

Drying procedure in three steps

1. Start of the drying

After starting up the MTS wall drying system the drying process is put into operation.

2. Reduction phase

A reduction in the wall dampness is already noticeable and measurable. The unpleasant mould and grey odour has disappeared. Now generally the renovation procedure can be started.

3. Final phase

The masonry moisture has been greatly reduced and has dropped to a natural residual level. The drying of the masonry is complete. Successful and permanent as long as the MTS system is in operation.